Sign In | Join Free | My xuijs.com
China Beijing Qinrunze Environmental Protection Technology Co., Ltd. logo
Beijing Qinrunze Environmental Protection Technology Co., Ltd.
Actors focused on environmental pollution control
Verified Supplier

2 Years

Home > Domestic Waste Landfill >

Proposal For Sewage Treatment Project of Domestic waste landfill Process Flow Diagram Unit Quotation And Operating Costs

Beijing Qinrunze Environmental Protection Technology Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Proposal For Sewage Treatment Project of Domestic waste landfill Process Flow Diagram Unit Quotation And Operating Costs

Brand Name : QRZ

Model Number : Process Project Proposal

Place of Origin : China

MOQ : 1

Price : ¥1500-¥6000

Payment Terms : D/P, T/T

Supply Ability : 1 per week

Delivery Time : 3-5 working days

Packaging Details : NONE

Contact Now

Proposal For Sewage Treatment Project of Domestic waste landfill Process Flow Diagram Unit Quotation And Operating Costs

Provide process technical support:
1. Include basic information, design scale, inlet water quality, discharge requirements, and other requirements.
2. Include preliminary process flow diagram and explanation.
3. Contains roughly the main equipment units and main equipment.
4. Provide a list of main buildings and dimensions
5. Main indicators including preliminary estimated total price or unit quotation list, electricity consumption, operating costs, land area, etc.

Service standards:
1. Provide process route, flowchart, and main supporting explanations
2. Responsible for ensuring that the process meets the owner's requirements
3. Provide a list of major equipment or units
4. Provide the main dimensions of buildings and structures
5. Provide main indicators such as land occupation, investment, freight, and electricity consumption.

What the customer needs to provide:
1. Project location, basic inflow water quality or industry category, design scale and other operating conditions. Provide the completion drawings of various specialties of the existing sewage station for renovation (optional), reasons for renovation/existing problems, actual inflow and outflow water quantity and quality, process and equipment operation status, etc.
2. Emission/reuse standard requirements, including water, gas, slag/mud.
3. Floor area, size, and surrounding environment (optional)
4. The general budget concept of the owner (optional)
5. Recommended or preferred process by the owner (optional)
6. Pre project materials (environmental impact assessment, feasibility study, etc.)+(preferably available, optional)
7. Time requirements
8. Customer's own introduction materials, etc. (if needed by the customer).

Plan duration and delivery format:
1. 3-5 working days.
2. PDF electronic version.

Fee standard:
1. 1500-6000 yuan.
2. Charge 0.1% of the total project investment. The fee for the 1500 to 6000 interval above will be calculated based on actual costs. Fees will be charged based on the first two standards for items below or exceeding.
3. Calculate separately for special or complex processes.
4. The renovation project will be increased by 5-20% based on the above foundation.




Product Tags:

Sewage Treatment Project Unit Quotation

      

Sewage Treatment Project Operating Costs

      

Sewage Treatment Project Introduction

      
Best Proposal For Sewage Treatment Project of Domestic waste landfill Process Flow Diagram Unit Quotation And Operating Costs wholesale

Proposal For Sewage Treatment Project of Domestic waste landfill Process Flow Diagram Unit Quotation And Operating Costs Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Beijing Qinrunze Environmental Protection Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0